Main reasons for floor level differences between rooms
The difference in floor levels between rooms can range from 1 to even 4 cm. This, in turn, disrupts the interior aesthetics, hinders the movement of cleaning robots, and creates a tripping hazard. Unevenness can occur during construction, during renovation, or as a result of using materials of different thicknesses, e.g., when you combine thick gres tiles bonded with adhesive with thin vinyl panels. Other possible causes of floor level differences are:
- Errors during screeding – when performing this activity, it is easy to make a mistake and pour the concrete subfloor to the same height throughout the entire apartment, without taking into account the different thicknesses of the planned finishing materials.
- Crooked or settling ceilings – in old houses and tenement buildings, the subfloor can settle over the years, creating a noticeable slope.
- Laying a new floor on an old one – installing panels on old parquet in one room raises its level and causes unevenness relative to other rooms.
- Underfloor heating in selected areas – installing heating pipes, e.g., only in the bathroom, requires a thicker subfloor than in the hallway.
Available methods for leveling the floor
The method of leveling the floor depends primarily on the size of the difference and the type of both surfaces. For small heights, an appropriate leveling layer or threshold strip is sufficient, while larger differences may require raising the subfloor level. How to efficiently level the floor?
Threshold strip – an effective way to mask a small difference in levels
A 1 cm floor level difference does not require complex and costly renovation work. In such a case, using an aluminum or brass threshold strip with a reduction profile is completely sufficient. Its design is deliberately shaped at a slight angle, which allows for a smooth and gentle connection between the higher and lower floor.
Thanks to the threshold strip, such a transition is almost invisible, and at the same time, the profile perfectly protects the edges of the panels from chipping and guarantees an aesthetic visual effect in just a few minutes.
In our store, you will find a wide selection of threshold strips, as well as stylish carpet strips and floor-to-floor strips.
Raising the floor level using a subfloor or additional subfloor layer
If you are wondering how to raise the floor by 2 cm or 3 cm, using a subfloor or an additional subfloor layer may be a good solution for you. With such a clear height difference, the subfloor level should be leveled across the entire surface of the lower room. To gain an additional 2 centimeters, rigid screed boards, hard high-density XPS foam boards, or special cement subfloors poured using the dry method are most often used.
Creating such a structure takes more time, but it guarantees an perfectly level floor and improves its functional properties. Special boards or subfloors create a stable base for new panels, and also improve their thermal and acoustic insulation.
Leveling the subfloor using screed
A 4 cm floor level difference entails the need to use screed. First, the subfloor must be cleaned, primed, and protected from moisture. Then the mass is spread over the surface, controlling its thickness using levels or a spirit level. After the screed dries, you can proceed to lay panels, tiles, or carpet. This method is the most labor-intensive, but it allows you to permanently level the surface, even when there is a very large floor level difference.
What mistakes can occur during the repair of floor level differences?
The mistake is primarily the improper selection of the method relative to the size of the difference between the floors. Using too thin a screed with a large step will cause the material to crack quickly and start crumbling. In turn, trying to level a several-centimeter difference with a thick strip alone will create too steep and dangerous a transition between rooms. A serious mistake is also the lack of using an appropriate primer, which causes the new subfloor layer not to bond with the old concrete and to pull away from it.
In the case of small differences, the proper selection of a threshold strip is important. In our store, you can check the properties of each model and find out what unevenness it can level. We also offer stylish PVC corner pieces and furniture strips, which will allow you to finish any interior impressively.
What is the cost of leveling the floors and what does it depend on?
The cost of leveling the difference in levels between rooms can range from approximately 30 to even 500 zlotys per square meter of screed performed. The final price depends on, among other things:
- leveling method – a transition strip is much cheaper than making a new screed,
- size of the level difference – the greater the height to level, the more material and effort is needed for the renovation work,
- type of materials used – the price depends on, among other things, the type of screed, leveling mass, subfloor, or strip,
- condition of the existing subfloor – chipping off tiles, repairing cracks, or additional surface preparation increases the cost of the service,
- room area – a larger area means high material consumption and more time needed to complete the task.
Leveling the floor level will immediately improve the appearance and increase the functionality of any home or apartment. Thanks to level transitions, combining different materials, such as tiles and panels, becomes much easier, more convenient, and safer.






Share:
How to choose baseboards? 5 rules you need to remember
Installing Baseboards Step-by-Step [Beginner's Guide]